ASAE/ASABE S442.2

$36.00

Format: PDF      In Stock

 

Sale!
-50%

ASAE/ASABE S442.2

$36.00

Water and Sediment Control Basins
standard by The American Society of Agricultural and Biological Engineers, 02/01/2017

Format: PDF      In Stock

 

Category:

NOTE: Our website provide PDF immediately download, sometimes when the payment is processed and you did not receive the file, please feel free to connect with us.

Description

This Standard is intended to guide engineers and technicians in the planning, design, layout, construction and maintenance of water and sediment control basins (WASCOBs). These basins consist of an earth embankment with a level top section constructed across a watercourse or gulley to form a sediment trap and a water detention basin.

This Standard applies where gully erosion is a problem or there is a need to manage runoff leaving a site. The soils and site conditions must be suitable to build an earth embankment and the topography must provide adequate detention storage. The site must provide an adequate outlet either through an underground outlet or by infiltration into the soil.

Water and sediment control basins differ from terraces in that they do not necessarily follow the contour of the land, and they do not necessarily reduce slope length as defined in the Revised Universal Soil Loss Equation 2. The reduction in sheet and rill erosion may be slight with the use of WASCOBs. However, they may be used in conjunction with terrace systems.

Product Details

Published:
02/01/2017
Number of Pages:
6
File Size:
1 file , 300 KB