ISA 77.13.01-1999 (R2008)

$41.50

Format: PDF      In Stock

 

Sale!
-50%

ISA 77.13.01-1999 (R2008)

$41.50

Fossil Fuel Power Plant Steam Turbine Bypass Systems
standard by The International Society of Automation, 12/30/2008

Format: PDF      In Stock

 

Category:

NOTE: Our website provide PDF immediately download, sometimes when the payment is processed and you did not receive the file, please feel free to connect with us.

Description

This standard covers the design requirements and operator interface for steam turbine bypass systemsfor drum and once-through steam generators and combined cycle plants. Hardware configurations aresuggested to obtain the minimum design requirements to obtain a safe and operable system. Both fixedpercentage bypass and variable pressure systems are covered.It is applicable to boilers with steam capacities of 200,000 lb/hr (25 kg/s) or greater.

This standard establishes the minimum requirements for design specifications to implement steam turbine bypass systems and hardware configurations for drum and once-through, fossil fuel power plant boilers. The turbine bypass system should provide for cold start-up, warm start, hot restart, load rejection, turbine shutdowns, and unit trips. The system shall be designed to provide pressure, temperature, and flow control of steam around and through the turbine by controlling each bypass valve, isolation valve, and associated desuperheater. The desuperheating function may be integral with the bypass valve. The turbine bypass system does not interface with the turbine control and supervisory system. The turbine bypass system is set to maintain steam pressure, and any coordination with the turbine is through interaction with the process as the turbine demands more or less steam. There is no direct interconnection of control systems.

Product Details

Published:
12/30/2008
ISBN(s):
9781934394748, 1556177119
ANSI:
ANSI Approved
Number of Pages:
42